Home Key figures
Key figures
School broadband key figures
The speeds, dates and deadlines that matter when you buy internet connectivity for a school — each with where it applies and its official source.
Target year for the 6 core digital and technology standards
2030
England · Standards page updated 16 September 2026
Schools and colleges should be working towards the core standards by 2030. Filtering, monitoring and cyber security are different: they support statutory duties under KCSIE.
Source: DfE: Meeting digital and technology standards in schools and colleges Checked 25 October 2026
Primary school broadband: download
at least 100 Mbps
England · 2030 core standard
Over full fibre (a leased line or FTTP). The standard pairs it with at least 30 Mbps upload.
Source: DfE: Broadband internet core standard Checked 25 October 2026
Secondary and all-through school broadband: download
capacity for 1 Gbps
England · 2030 core standard
The standard says capacity for 1 Gbps download and upload, over full fibre. It applies to further education colleges too.
Source: DfE: Broadband internet core standard Checked 25 October 2026
Traditional (analogue) phone lines go digital
31 January 2027
UK · 2027
Alarms, lift lines, door entry and card machines on copper lines need checking before then. Lines not moved in time may go onto Openreach’s EVAc service.
Source: Openreach: Upgrading the UK to digital phone lines · DfE: Prepare your education estate for the PSTN and ISDN switch-off Checked 25 October 2026
Primary school broadband: upload
at least 30 Mbps
England · 2030 core standard
Source: DfE: Broadband internet core standard Checked 25 October 2026
Secondary and all-through school broadband: upload
capacity for 1 Gbps
England · 2030 core standard
Source: DfE: Broadband internet core standard Checked 25 October 2026
Copper broadband and the DfE standard
“copper connections do not meet this standard”
England · 2030 core standard
The connection should be full fibre: a leased line or fibre to the premises (FTTP).
Source: DfE: Broadband internet core standard Checked 25 October 2026
Backup broadband connection
A second connection of a different type, with automatic failover
England · 2030 core standard
DfE’s examples are a leased line with FTTP, or FTTP with low Earth orbit (LEO) satellite, plus redundant power on core network equipment. Put it in alongside a new connection, or as soon as possible afterwards.
Source: DfE: Broadband internet core standard Checked 25 October 2026
Keeping children safe in education 2026 in force
1 September 2026
England · 2026 edition
Statutory guidance: schools and colleges must have regard to it. The filtering and monitoring paragraphs are 173 to 177.
Source: Keeping children safe in education (collection page) · Keeping children safe in education 2026 (PDF) Checked 25 October 2026
Review of filtering and monitoring
at least once every academic year
England · KCSIE 2026, para 173
Led by the senior leader responsible, with the designated safeguarding lead and IT support, and recorded.
Source: Keeping children safe in education 2026 (PDF) · DfE: Filtering and monitoring core standard Checked 25 October 2026
Wireless standard to upgrade to
at least Wi-Fi 7 (802.11be)
England · 2030 core standard
Meet it when upgrading an underperforming or unsupported wireless network.
Source: DfE: Wireless network core standard Checked 25 October 2026
Switch speed to desktop devices
at least 1 Gbps
England · 2030 core standard
With multi-gigabit ports for servers, media devices and wireless access points.
Source: DfE: Network switching core standard Checked 25 October 2026
Links from hub-room switches to the core
at least 2 × 10 Gbps
England · 2030 core standard
On different routes where possible.
Source: DfE: Network switching core standard Checked 25 October 2026
Warranty and support on network switches
at least 5 years
England · 2030 core standard
Including firmware updates. Replace equipment that no longer gets firmware and security updates.
Source: DfE: Network switching core standard Checked 25 October 2026
Critical or high security fixes applied
within 14 days of release
England · Cyber security standard
CVSS v3.1 score of 7.0 or above, or no rating given. DfE security instructions should be applied within 5 working days.
Source: DfE: Cyber security core standard Checked 25 October 2026
Backups
3 copies, on 2 separate devices, 1 off-site
England · Cyber security standard
Backups should be immutable and tested termly, including a restore.
Source: DfE: Cyber security core standard Checked 25 October 2026
Reporting a high-risk data breach to the ICO
within 72 hours
UK · Referenced in the cyber security standard
Source: DfE: Cyber security core standard Checked 25 October 2026
Connect the Classroom funding
£325 million
England · 2025 to 2030 financial years
For wifi access points and network switches. It follows £215 million invested between 2021 and 2025. DfE contacts eligible schools directly — check gov.uk for current eligibility.
Source: DfE: Connect the Classroom Checked 25 October 2026
Janet internet transit for schools connected through regional broadband consortia
500 Gb/s
England · Jisc, 2026
High-capacity, resilient transit, funded through DfE support for Janet services to schools.
Source: Jisc: Janet IP connection Checked 25 October 2026
Crown Commercial Service became the Government Commercial Agency (GCA)
1 April 2026
UK · 2026
Existing CCS frameworks, contracts and call-offs remain valid.
Source: Government Commercial Agency: Crown Commercial Service Checked 25 October 2026
GCA Network Services 3 (RM6116) end date
17 July 2027
UK · 2027
Lots 1c and 1d end on 22 May 2027.
Source: GCA: Network Services 3 (RM6116) Checked 25 October 2026
Wales: minimum availability of the school connection
99.9%
Wales · Hwb connectivity standards
With guaranteed restoration within 6 hours if the service fails completely.
Source: Hwb: Connectivity (broadband) standards Checked 25 October 2026
Wales: restoring a total service failure
within 6 hours
Wales · Hwb connectivity standards
Source: Hwb: Connectivity (broadband) standards Checked 25 October 2026
Wales: small-school exception for dedicated fibre
fewer than 50 learners
Wales · Hwb connectivity standards
Exceptions to the dedicated, symmetrical fibre standard may apply for these schools where dedicated services are unavailable.
Source: Hwb: Connectivity (broadband) standards Checked 25 October 2026
Scottish Wide Area Network (SWAN) contract
up to £350 million over six years
Scotland · Awarded October 2023
Covering more than 6,000 sites and 94 public sector organisations, schools among them.
Source: SWAN: NSS awards £350 million SWAN contract to BT (October 2023) Checked 25 October 2026
US school internet target (not UK guidance)
100 Mbps per 1,000 users short term; 1 Gbps per 1,000 users longer term
United States only · FCC, 2014
Shown for reference only. No current UK government source gives a per-pupil figure.
Source: US FCC: Summary of the E-rate Modernization Order Checked 25 October 2026